PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fireproofing the 2nd Floor Facing North (800x600).jpg Installing duct work at the 1st floor Facing North (800x600).jpg Installing the Main Sprinkler piping at the 1st Floor Facing South (800x600).jpg Plumber started installing the copper piping at the 1st floor Facing East (800x600).jpg Sprinkler piping at the 1st Floor Facing East (800x600).jpg
Previous page Sprinkler piping at the 1st Floor Facing East (800x600)
Sprinkler piping at the 1st Floor Facing East (800x600)